Designing performance management
The second half of sub-criterion 1.5: a performance management system that turns strategy into numbers people actually steer by.
The design logic is a cascade. Strategy defines what matters. What matters becomes a small set of key indicators with targets. Targets flow down to units and teams, translated — not photocopied — into measures each level can influence. Results flow back up, get reviewed at a fixed rhythm, and trigger decisions.
Every link in that chain can break. Indicators that measure what is easy instead of what matters. Targets set by negotiation rather than ambition. Reviews that admire the dashboard without deciding anything. Front-line teams tracking metrics they cannot influence, which is the fastest way to teach people that measurement is theatre.
My favourite diagnostic as an assessor takes one minute: pick any KPI on the executive dashboard and ask the owner what decision it last triggered. If the honest answer is none, the indicator is decoration.
A good performance system is small, connected and consequential. Twenty indicators that drive decisions beat two hundred that drive PowerPoint. Design for steering, not for reporting.