EFQM and Strategy Assessors

Case: business continuity, tested for real

A fintech had a business-continuity plan that read beautifully. Recovery time objectives, backup sites, call trees — all documented for their ISO 27001 certification, none ever exercised under realistic conditions.

I asked to test it properly: assume the primary system is down and unrecoverable, now, during business hours. Walk me through it. Within twenty minutes the plan had unravelled. Backups existed but no one had restored one in a year — and the last restore, we discovered, would have failed. The call tree listed a key engineer who'd left. The "alternate site" needed access nobody present could grant.

None of this is unusual. A continuity plan that has never been tested is a hypothesis, not a capability. The standard asks for testing precisely because paper plans hide these gaps.

We ran quarterly restores, fixed the tree, and rehearsed a full failover. Six months later a real outage hit. Recovery took under an hour. The plan finally described what the organisation could actually do — because it had done it.