EFQM and Strategy Assessors

Performance and risk: two sides of one coin

Sub-criterion 5.1 pairs driving performance with managing risk — a coupling the 2025 Model makes deliberately, because performance pursued without risk awareness is borrowing, not earning.

Every performance push carries a shadow. Stretch targets can stretch ethics. Cost programmes can consume the maintenance, training and buffers whose absence surfaces two years later as failures with interest. Growth can outrun controls — most corporate scandals are, at root, performance systems that outpaced their brakes. When results improve dramatically, the excellent organisation celebrates and audits.

Operational risk management, in the mature version, is embedded rather than adjacent: risk considered inside decisions — pricing, launches, capacity, hiring — not reviewed annually beside them. Leading indicators watched, because incidents are late data: near-misses, overtime trends, audit findings ageing unresolved, turnover in control functions. And resilience built on purpose: the redundancies, cross-training and scenario rehearsals that pure efficiency logic would delete, and genuine crises vindicate.

The cultural key is what happens to bad news. In organisations where problems can be reported without punishment, risk information flows and small issues stay small. Where the numbers must always be green, reality goes underground until it erupts.

Tomorrow: transformation itself — 5.2.